Event Summary
 
  FILE SAVED AS: SWPP_25727_20210321_1800.htm  
 
 Incident:   SWPP_25727_20210321_1800   Date:  03/21/2021 (CST)   Reliability Coordinator:  SWPP 
 Initial Conditions:   N/A
 Flowgate:   25727 - TMP423: MRYVL_SJ - MIDWAY5 161...   Rating:  0   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   03/21/2021 18:00 (CST)   Effective EndTime:  03/21/2021 20:30 (CST)   TLR Duration:  2 Hours and 30 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Mar 21 
17:30 (CST) 
 TLR 5A   NEXT 
 7-F 
 Total 
 1 / 0 
 1  /  0 
 1 
 1 
 0.1 
 0.1 
 1 
 1 
 0.1 
 0.1 
 0 
 0 
 0.0 
 0.0 
 AECI 
 Total 
 7.0 
 7.0 
 7.0 
 7.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.1 
 0.0 
 0.0 
 0.0 
 0.1 
 0.0 
 0.0 
 0.0 
 0.0 
 0.1 
 0.0 
 0.0 
 0.0 
 0.1 
 120   N/A  N/A N/A
Mar 21 
18:36 (CST) 
 TLR 5A   NEXT 
 7-F 
 Total 
 1 / 0 
 1  /  0 
 1 
 1 
 0.1 
 0.1 
 1 
 1 
 0.1 
 0.1 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 
 0.0 
 0.0 
 7.6 
 0.0 
 9.4 
 0.0 
 0.0 
 0.0 
 16.9 
 0.0 
 0.0 
 7.6 
 0.0 
 9.4 
 0.0 
 0.0 
 0.0 
 16.9 
 117   N/A  N/A N/A
Mar 21 
19:27 (CST) 
 TLR 5A   NEXT 
 7-F 
 Total 
 1 / 0 
 1  /  0 
 1 
 1 
 0.1 
 0.1 
 1 
 1 
 0.1 
 0.1 
 0 
 0 
 0.0 
 0.0 
 AECI 
 Total 
 3.0 
 3.0 
 3.0 
 3.0 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 FIRM-CREDIT 
 
 Total 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 MISO 
 SWPP 
 
 2.7 
 0.0 
 10.0 
 0.0 
 10.0 
 0.0 
 0.0 
 0.0 
 22.7 
 2.7 
 0.0 
 10.0 
 0.0 
 10.0 
 0.0 
 0.0 
 0.0 
 22.7 
 115   N/A  N/A N/A
Mar 21 
20:22 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   115   N/A  N/A N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   0   0   0   0 
 7   3   3   3   0 
 Total   3   3   3   0 
 
TLR NNL Totals
 CA   NNL Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 AECI   10.0   10.0 
 Total   10.0   10.0 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   2.7   2.7 
 ED-6   17.6   17.6 
 FIRM-7   19.4   19.4 
 Total MISO   39.7   39.7 
 SWPP   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for SWPP   0.0   0.0 
 Total   39.7   39.7